Home  |  Sitemap  |  中文
  New Energy Development Business
  Wind Farm Operations
 
The joint team of the Group and its parent company has already possessed battery technology, BMS technology and control system technology. In order to break the grid bottleneck to realize the industrialization of electric vehicles as soon as possible, China Energine, the CALT’s Institute 18 and UEG have entered into strategic partnership with the Beijing Bureau of State Grid. State Grid is responsible for the construction of the electric pile and charging system, mainly grid restructuring. The team of China Energine is responsible for all systems other than that. The two parties thus form a complementary association. In light of the unique market position of State Grid, such cooperation and association is of great significance, which is bound to promote the significant development of the aerospace electric vehicle industries in the Beijing market and the national market.

     
Copyright © 2024 China Energine International (Holdings) Limited. All rights reserved.  |  Disclaimer